Renovations Finished On Fieldhouse Locker Rooms

After Photos

Before Photos

 

Mason Facilities is excited to announce the completion and opening of the renovated Fairfax campus’ Field House locker rooms. Approximately 13,359 sq ft of existing space was remodeled to provide new shower and restroom areas for student-athletes and staff members. “The upgrades give new life to the spaces and will improve Mason's ability to recruit and retain student-athletes and coaches.” Said Christy Hogan, Sr. Director University Asset Management and leading project manager on this renovation. 

In 2022, Capital Planning & Strategies launched its Small Capital Improvement Pilot Program, through which Athletics (ICA) requested to have the open shower areas at the locker rooms renovated to provide individual shower stalls for increased student safety and privacy. In addition to the showers needing a reconfiguration, the common areas of the locker rooms were also outdated, in poor condition, and in need of a refresh.  

In total, the following changes were made to the male, female, and staff Field House locker rooms: 

  • Removal of public-use lockers (no longer in service) to provide an open area for team gatherings 
  • New individual shower stalls with separate areas for home and visiting teams 
  • New single-occupant toilet/shower/sink rooms in each locker room 
  • New toilet partitions  
  • New undermount sinks and quartz countertops 
  • New ceramic tiling on walls 
  • New epoxy flooring 
  • New LED light fixtures 
  • New paint throughout  

Special shoutout to: 

Christy Hogan (Sr. Director University Asset Management), Jesus Sanchez (Construction Field Representative), Laura Bayr (Sr. Interior Designer), John Forgy (University Environmental Graphic Designer & Sign Program Manager), Andrew Lieber (Sr Assoc Athletics Director, Capital Planning, Facilities, and Events), Ryan Jones (Director, Facilities Services, Intercollegiate Athletics), Caleb Aiosa-Perrin (Assistant Director, Facilities Services, Intercollegiate Athletics), Additional Facilities Management support teams, CannonDesign, and Green Touch Builders.