Project Number |
247-17050 |
|
Project Type |
Renovation |
|
Campus |
Fairfax |
|
Biennium |
2006 -
2008 |
|
Authorization |
Authorized |
|
Phase |
Design |
|
|
|
|
| |

|
|
|
|
|
| |
Project is for renovation of
President Park Phase 1. The renovation consists
of electrical upgrades, fire/safety upgrades,
mechanical improvements, upgrade or installation
of sprinklers, and various cosmetic upgrades for
these residence halls. |
|
|
|
| |
 |
| |
|
 |
| |
|
|
|
|
| Total
Project Budget |
$3,340,000 |
|
Construction Budget |
$2,783,000 |
|
|
|
|
| |
 |
| |
|
|
|
| |
| |
PLANNED |
CURRENT |
| Project Authorization |
|
|
| Design
Start |
May 05 |
Nov 05 |
| Design
Complete |
Feb 06 |
Oct 07 |
| Construction Start: |
Apr 06 |
May 08 |
| Construction Completion: |
Aug 06 |
Jul 08 |
| Furniture
Installation Completion: |
Aug 06 |
Jul 08 |
|
|
|
| Occupancy
(Ready for Use): |
Aug 06 |
Aug 08 |
|
|
|
|
| |
 |
| |
|
This project will replace existing fan coil units in student living areas, upgrade the fire alarm system, add a sprinkler system and provide miscellaneous architectural upgrades in support of the mechanical renovations. The project was bid in March 2007, however, bids came in over budget. The project is being re-designed to reduce the cost. The project will be constructed in two phases; the first phase will take place Summer 2008 and the second phase will be completed the subsequent summer.
|
|
| |
|
|
|
|
| |
|
 |
|