Chapter 5 – Mason Standard Details

Section

Title

Link/File Name

Date

3.1 Planning and Design Details – Exterior
3.1-1 Primary Road – Typical Street Section Chap 5\3.1-1 Primary Road Typical Street Section.pdf 6/3/2013
3.1-2 Secondary Road – Typical Street Section Chap 5\3.1-2 Secondary Road Typical Street Section.pdf 6/3/2013
3.1-3 Tertiary Road – Typical Street Section Chap 5\3.1-3 Tertiary Road Typical Street Section.pdf 6/3/2013
3.1-4 Shared Use Trail Section Chap 5\3.1-4 Shared Use Trail.pdf 6/3/2013
3.1-5 All Way Stop Intersection Chap 5\3.1-5 All Way Stop Intersection.pdf 6/3/2013
3.1-6 Side Street Stop Intersection Chap 5\3.1-6 Side Street Stop Intersection.pdf 6/3/2013
3.1-7 Major Mid-Block/Closely Spaced Mid-Block Crossing Chap 5\3.1-7 Major Mid-Block Crossing.pdf 6/3/2013
3.1-8 Parking Bay/Travel Way Chap 5\3.1-8 Parking Bay Travel Way.pdf 6/3/2013
3.1-9 Primary Walk Section and Plan Chap 5\3.1-9 Primary Walk Section and Plan.pdf 6/3/2013
3.1-10 Secondary Walk Section and Plan Chap 5\3.1-10 Secondary Walk Section and Plan.pdf 6/3/2013
3.1-11 Tertiary Walk Section and Plan Chap 5\3.1-11 Tertiary Walk Section and Plan.pdf 6/3/2013
3.1-12 Typical 12′ Primary Walk – Paver Dimensions Chap 5\3.1-12
Typical Primary Walk Paver Dimensions.pdf
6/3/2013
3.1-13 Intersection at Walkway Chap 5\3.1-13 Intersection at Walkway.pdf 6/3/2013
3.1-14 Secondary Walk – Paver Dimensions Chap 5\3.1-14 Secondary Walk Paver Dimensions.pdf 6/3/2013
3.1-15 Raised Crosswalk Chap 5\3.1-15 Raised Crosswalk Section and Plan.pdf 6/3/2013
3.1-16 Raised Crosswalk Chap 5\3.1-16 Raised Crosswalk.pdf 6/3/2013
3.1-17 Trail Cross-Sections Chap 5\3.1-17 Trail Cross Sections.pdf 6/3/2013
3.1-18 Campus Character Zones Chap 5\3.1-18 Campus Character Zones.pdf 6/3/2013
3.1-19 Landscape Buffer Detail Chap 5\3.1-19 Landscape Buffer Detail.pdf 6/3/2013
3.1-20 Landscape Buffer Detail Chap 5\3.1-20 Landscape Buffer Detail.pdf 6/3/2013
3.1-21 Retail Guidelines Chap 5\3.1-21 Retail Guidelines.pdf 6/3/2013
3.2 Planning and Design Details – Interior
3.2-1 Flexible Classrooms: 8-27 Students Chap 5\3.2-1 Flexible Classroom Diagrams.pdf 6/3/2013
3.2-2 Flexible Classrooms: 24-54 Students Chap 5\3.2-2 Flexible Classroom Diagrams.pdf 6/3/2013
3.2-3 High Volume/Density Classrooms: 48-70 Students Chap 5\3.2-3 High Volume Classroom Diagrams.pdf 6/3/2013
3.2-4 Mason Innovative Learning Space (MILS): 54-78 Students Chap 5\3.2-4 MILS Classroom Diagrams.pdf 6/3/2013
3.2-5 Lecture Hall: 48-72 Students Chap 5\3.2-5 Lecture Hall Diagrams.pdf 6/3/2013
3.2-6 Tiered Classroom Chap 5\3.2-6 Tiered Classroom Diagram.pdf 6/3/2013
3.2-7 Lecture Hall: 60-128 Students Chap 5\3.2-7 Lecture Hall Diagrams.pdf 6/3/2013
3.2-8 AV Floor Box Separation and Conduit Chap 5\3.2-8 AV Floor Box Separation and Conduit.pdf 6/3/2013
3.2-9 Single Projection Classroom Chap 5\3.2-9 Single Projection Classroom.pdf 6/3/2013
3.2-10 AV Floorbox and Conduit Chap 5\3.2.10 AV Floorbox and Conduit.pdf 6/3/2013
3.2-11 Biology Lab Diagrams Chap 5\3.2-11 Biology Lab Diagrams.pdf 6/3/2013
3.2-12 Biology Lab Diagrams Chap 5\3.2-12 Biology Lab Diagrams.pdf 6/3/2013
3.2-13 Biology Lab Diagrams Chap 5\3.2-13 Biology Lab Diagrams.pdf 6/3/2013
3.2-14 Biology Lab Diagrams Chap 5\3.2-14 Biology Lab Diagrams.pdf 6/3/2013
3.2-15 Biology Lab Diagrams Chap 5\3.2-15 Biology Lab Diagrams.pdf 6/3/2013
3.2-16 Biology Lab Diagrams Chap 5\3.2-16 Biology Lab Diagrams.pdf 6/3/2013
3.2-17 Biology Lab Diagrams Chap 5\3.2-17 Biology Lab Diagrams.pdf 6/3/2013
3.2-18 Biology Lab Diagrams Chap 5\3.2-18 Biology Lab Diagrams.pdf 6/3/2013
3.2-19 Biology Lab Diagrams Chap 5\3.2-19 Biology Lab Diagrams.pdf 6/3/2013
3.2-20 Chemistry Lab Diagrams Chap 5\3.2-20 Chemistry Lab Diagrams.pdf 6/3/2013
3.2-21 Chemistry Lab Diagrams Chap 5\3.2-21 Chemistry Lab Diagrams.pdf 6/3/2013
3.2-22 Chemistry Lab Diagrams Chap 5\3.2-22 Chemistry Lab Diagrams.pdf 6/3/2013
3.2-23 Chemistry Lab Diagrams Chap 5\3.2-23 Chemistry Lab Diagrams.pdf 6/3/2013
3.2-24 GeoScience Lab Diagrams Chap 5\3.2-24 Geoscience Lab Diagrams.pdf 6/3/2013
3.2-25 Physics Lab Diagrams Chap 5\3.2-25 Physics Lab Diagrams.pdf 6/3/2013
3.2-26 Physics Lab Diagrams Chap 5\3.2-26 Physics Lab Diagrams.pdf 6/3/2013
3.2-27 Physics Lab Diagrams Chap 5\3.2-27 Physics Lab Diagrams.pdf 6/3/2013
3.2-28 Conference Room Diagram (TBD) Chap 5\3.2-28 Conference Room Diagrams.pdf 6/3/2013
3.2-29 Faculty Offices Chap 5\3.2-29 Faculty Office Diagrams.pdf 6/3/2013
3.2-30 Collaboration Environment for Part-Time Faculty, GRA’s and GTA’s Chap 5\3.2-30 Collaboration Environment Diagrams.pdf 6/3/2013
3.2-31 Sign Type A Chap 5\3.2-31 Sign Type A.pdf 6/3/2013
3.2-32 Sign Type B Chap 5\3.2-32 Sign Type B.pdf 6/3/2013
3.4 Planning and Design Details – Environmental
3.4-1 Stormwater Management Concepts Chap 5\3.4-1 Stormwater Management Concepts.pdf 6/3/2013
3.5 Planning and Design Details – Accessibility
3.5-1 Typical Ramp Section (TBD) Chap 5\3.5-1 ADA Ramp.pdf 6/3/2013
3.5-1B ADA Handrail Detail Chap 5\3.5-1B ADA Handrail.pdf 6/3/2013
3.5-2 Toilet Fixture and Accessory Mounting Height Chap 5\3.5-2 Toilet Fixture and Accessory Mounting Height.pdf 6/3/2013
3.5-3 Ramps at Mid-Block Crossing Chap 5\3.5-3 Ramps at Mid-Block Crossing.pdf 6/3/2013
3.5-4 Ramps at Corner Crossing Chap 5\3.5-4 Ramps at Corner Crossing.pdf 6/3/2013
3.5-5 Ramps – Flared Sides Chap 5\3.5-5 Ramps with Flared Sides.pdf 6/3/2013
3.5-6 Ramps – Grade Breaks Chap 5\3.5-6 Ramps with Grade Break.pdf 6/3/2013
4.1 Construction Products and Activity Details – Facility Construction
4.1-1 HTHW Tunnel Detail, Fairfax Campus Chap 5\4.1-1 HTHW Tunnel.pdf 6/3/2013
4.1-2 HTHW Tunnel Top Details Chap 5\4.1-2 HTHW Tunnel Top.pdf 6/3/2013
4.1-3 HTHW Manhole Detail Chap 5\4.1-3 HTHW Manhole Detail.pdf 6/3/2013
4.1-4 Preferred Corner Anchorage Chap 5\4.1-4 Preferred Corner Anchorage.pdf 6/3/2013
4.2 Construction Products and Activity Details – Facility Services
4.2-1 Single Duct Mounted, Water/Glycol Heating Coil w/ 2-Way Control Valve Reserved Reserved
4.2-2 Single Duct Mounted, Water/Glycol Heating Coil w/ 3-Way Control Valve Reserved Reserved
4.2-3 2-Pipe Fan Coil, 2-Way Control Valve Reserved Reserved
4.2-4 2-Pipe Fan Coil, 3-Way Control Valve Reserved Reserved
4.2-5 4-Pipe Fan Coil, 2-Way Control Valve Reserved Reserved
4.2-6 4-Pipe Fan Coil, 3-Way Control Valve Reserved Reserved
4.2-7 Water Source Heat Pump Reserved Reserved
4.2-8 Fan Powered Air Terminal Connections (Series) Reserved Reserved
4.2-9 Fan Powered Air Terminal Connections (Parallel) Reserved Reserved
4.2-10 Water Coil w/ Freeze Protection Pump Reserved Reserved
4.2-11 Below Ground Building Service Penetration Through Foundation Wall Reserved Reserved
4.2-12 Typical Freezestat Layouts for AHU Cooling Coils Reserved Reserved
4.2-13 Typical Building Central Heating System Schematic (Fairfax Campus) Reserved Reserved
4.2-14 Typical Building Control Cooling System Schematic (Fairfax Campus) Reserved Reserved
4.2-15 Light Pole – Type III Medium Chap 5\4.2-15 Light Pole Type III Medium.pdf 6/3/2013
4.2-16 Light Pole – Type V Medium Chap 5\4.2-16 Light Pole Type V Medium.pdf 6/3/2013
4.2-17 Type III Roadway Lighting Pole Base Foundation Detail Chap 5\4.2-17 Type III Roadway Lighting Pole Base.pdf 6/3/2013
4.2-18 Type V Sidewalk Lighting Pole Base Foundation Detail Chap 5\4.2-18 Type V Sidewalk Lighting Pole Base.pdf 6/3/2013
4.2-19 The Edge LED Area Light – Type III Medium (120 LEDs) Chap 5\4.2-19 Edge LED Area Light Type III Medium.pdf 6/3/2013
4.2-20 The Edge LED Area Light – Type V Medium (80 LEDs) Chap 5\4.2-20 Edge LED Area Light Type V Medium.pdf 6/3/2013
4.2-21 The Edge LED Area Light – Type V Medium (40 LEDs) Chap 5\4.2-21 Edge LED Area Light Type V Medium.pdf 6/3/2013
4.2-22 Communications Details Chap 5\4.2-22 Communications Details.pdf 6/3/2013
4.2-23 Typical Copper and Fiber Riser Diagram Chap 5\4.2-23 Copper and Fiber Riser Diagram.pdf 6/3/2013
4.3 Construction Products and Activity Details – Site and Infrastructure
4.3-1 General Recommendations for Structural Fill Chap 5\4.3-1 Structural Fill.pdf 6/3/2013
4.3-2 Subdrain Detail for Below Grade and Site Retaining Walls Chap 5\4.3-2 Subdrain Detail for Below Grade and Site Retaining
Walls.pdf
6/3/2013
4.3-3 Footing Undercut Detail Chap 5\4.3-3 Footing Undercut Detail.pdf 6/3/2013
4.3-4 Planting Details Chap 5\4.3-4 Planting Details.pdf 6/3/2013
4.3-5 Ball Marker Installation – MCI100 Chap 5\4.3-5 Ball Marker Installation.pdf 6/3/2013
4.3-6 Bollard Detail Chap 5\4.3-6 Bollard Detail.pdf 6/3/2013
4.3-7 Collapsible Bollard Detail Chap 5\4.3-7 Collapsible Bollard.pdf 6/3/2013
4.3-8 Downspout Cleanout Chap 5\4.3-8 Downspout Cleanout.pdf 6/3/2013
4.3-9 Sanitary Sewer Lateral Cleanout Detail Chap 5\4.3-9 Sanitary Sewer Lateral Cleanout.pdf 6/3/2013
4.3-10 Pavement Wedging Detail Chap 5\4.3-10 Pavement Wedging Detail.pdf 6/3/2013
4.3-11 Pavement Patch Detail Chap 5\4.3-11 Pavement Patch Detail.pdf 6/3/2013
4.3-12 Typical Asphalt Pavement Section Chap 5\4.3-12 Typical Asphalt Pavement Section.pdf 6/3/2013
4.3-13 Brick Paver Detail Chap 5\4.3-13 Brick Paver Section and Plan.pdf 6/3/2013
4.3-14 Sidewalk Detail Chap 5\4.3-14 Sidewalk Section.pdf 6/3/2013
4.3-15 Wheelstop Detail Chap 5\4.3-15 Wheelstop Detail.pdf 6/3/2013